Homestead Hill AC Main Replacement

Project Details

The scope of work for construction consists of the replacement of approximately 6,050 lineal feet of end-of-lifecycle 6-inch and 8-inch asbestos cement (AC) water main with new 4-inch and 8-inch ductile iron (DI) water main, replacement of fire hydrants, valves, water service lines, asphalt concrete patching and overlay, driveway repair, and surface restoration. 

Project Benefits

  • Fewer leaks and breaks
  • Enhanced water quality
  • Better fire protection flow
  • Reduced maintenance costs
  • Lower risk of water service interruptions

Schedule

The District's Contractor, Fury Site Works, will begin construction in June 2025, wrapping up in December 2025. 

What to Expect During Construction

  • Equipment noise
  • Construction traffic
  • Street detours with local access
  • Driveway and pedestrian access restrictions
  • Temporary water service interruptions during construction

Questions? Contact the District Office at 253-630-9900 or customer_service@sooscreek.com

Project Area

Project Area - Homestead Hills AC Water Main Replacement